翻訳と辞書
Words near each other
・ Nanstallon
・ Nanstein Castle
・ Nanstelocephala
・ Nansun Shi
・ Nansy Damianova
・ Nansō Satomi Hakkenden
・ NAnt
・ Nant (disambiguation)
・ Nant Brân
・ Nant Bwa Bwa Phan
・ Nant Cledlyn Pingos
・ Nant Clydach Pastures
・ Nant Conwy RFC
・ Nant Conwy Rural District
・ Nant Cynnyd
Nant de Drance Hydropower Plant
・ Nant Ffrancon Formation
・ Nant Ffrancon Pass
・ Nant Gelliwion Woodland
・ Nant Glais Caves
・ Nant Glas
・ Nant Gwernol railway station
・ Nant Gwrtheyrn
・ Nant Gwynant
・ Nant Gwys
・ Nant Hir Formation
・ Nant Hir Group
・ Nant Irfon National Nature Reserve
・ Nant Llech
・ Nant Mill


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Nant de Drance Hydropower Plant : ウィキペディア英語版
Nant de Drance Hydropower Plant

The Nante de Drance Hydropower Plant is a pumped-storage power station currently being constructed in the canton of Valais in Switzerland. It is within the municipality of Finhaut, district of Saint-Maurice and about southwest of Martigny. Construction on the power plant began in 2008 and it should begin operations in 2018. It is owned by Nant de Drance SA, a consortium of Alpiq (39%), SBB (36%), Industrielle Werke Basel (IWB) (15%) and Forces
Motrices Valaisannes (FMV) (10%). When complete, the US$1.9 billion plant will have an installed capacity of 900 MW.
==Background==

On 25 August 2008, the Swiss Federal Department of Environment, Transport, Energy and Communications granted a building permit to Nate de Drance SA for the construction of the plant with a 600 MW design. Preliminary construction began in September 2008 but a concession was granted in April 2011 which allowed for a larger 900 MW plant. Excavation of the tunnels began in 2009 and the caverns commenced in 2010. Raising of the upper Vieux Emosson Dam began in Spring 2013 and should be done by the end of 2015. The underground power house excavation was complete in April 2014.〔(【引用サイトリンク】url=http://www.alpiq.com/what-we-offer/our-assets/hydropower/hydropower-plant-projects/nant-de-drance.jsp )〕 The first generators should be tested in 2017 with all six commissioned between 2018 and 2020.〔
In December 2014, at the International Tunnelling & Underground Space Awards, the project was awarded the Major Tunnelling Project of the Year award in the category of projects over US$500 million.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Nant de Drance Hydropower Plant」の詳細全文を読む